İzmit Tüpraş Refinery 2008-2023 Turkey
- Plant 2 Crude-oil-Vacuum Unit Column and Drum Maintenance Works
- Plant 2 Crude-oil–Vacuum Unit 2c-1 2c-4 Columns Base Plate Replacement
- Plant 2 Crude-oil– Vacuum Unit 2f-2 Furnace Tube Replacement
- Plant 33 Isopentane Unit 33f-202 Guillotine Repair and Maintenance Works
- Plant 25 Hampetrol Unit 25e 12a/B Heat Exchangers Retubing and Testing Works
- Cleaning and Testing of Plant 47 47e-8 Coolers
- Plant 47 47e-8 Heat Exchangers Band Replacement and Test Works
- Plant 5 Hampetrol – Vacuum Unit 5e-102 Damper Maintenance Works
- Plant 7 Fcc Unit Planned Shutdown Unit Works
- Plant 25 Hampetrol Unit Planned Shutdown Unit Works
- Plant 26 Asphalt Vacuum Unit Planned Shutdown Unit Works
- Plant 7 Fcc Unit Planned Stance Unit Works
- Plant 25 Hampetrol Unit Planned Shutdown Coolers Maintenance and Test Works
- Maintenance and Testing of Plant 7 Fcc Unit Planned Shutdown Coolers
- Plant 26 Asphalt Vacuum Unit Planned Shutdown Maintenance and Testing of Coolers
- Plant 9 Electricity – Steam Generation Unit Alternator Condenser Maintenance Works
- Plant 7 Fcc Lpg2 Planned Intermediate Stop Heat Exchangers and Coolers Cleaning-Maintenance and Tests
- Plant 7 Fcc Lpg2 Planned Intermediate Stop Column and Drams Maintenance and Repair Works
- Plant 7 Fcc Lpg2 Planned Intermediate Stop Unit Works
- Plant 10 Electricity – Steam Generation Unit 103 A Boiler Maintenance and Repair Works
- Plant 6 Unifiner Unit Whb-B Tubes Partial Renewal Tests and Body Hair Welding Works
- Plant 63 Ccr Unit Planned Shutdown Maintenance and Testing of Heat Exchangers and Air Coolers
- Plant 47 48 19 21 Units Planned Shutdown Column Dram Heat Exchanger and Air Cooler Maintenance-Repair Test Works
- Plant 2 7 74 5 47 48 21 Safety Valves Orifice Disassembly-Assembly Works in Planned Shutdown of Units
- Refinery-wide Battery Shot/Down H2s and Flare Lines Renovation and Renovation Valve Replacement Works
- Maintenance and Replacement of Refinery-wide Fire Circuit Valves 2013
- Maintenance and Replacement of Refinery Wide Fire Circuit Valves 2014
- Plant 7 Fcc Lpg1 Unit Intermediate Stop Heat Exchanger, Air Cooler, Column and Drams Maintenance and Tests
- Plant 7 Fcc Lpg1 Unit Intermediate Stop Safety Valves and Orifise Disassembly-Assembly Works
- Plant 25 Hampetrol Isopentane Furnace Retub Work
- Plant 5 Furnace Retub and Air Duct Replacement Work
- Plt 2 Column Maintenance
- Plt2 Cooler Retub Works
Tüpraş Izmir Refinery 2008-2019 Turkey
- Shell Sleeve Replacement and Testing of Plant U8000 E 8201 A1-2-3 B1-2-3 High Pressure Combined Heat Exchangers
- Maintenance and Testing of Plant U 9000 Ccr Planned Shutdown Heat Exchangers
- Plant U 300-400 Kero Diesel 100 Hampetrol Planned Shutdown Maintenance and Testing of Heat Exchangers
- Refinery-Wide Metal-Maintenance-Repair Works
- Plant 8500 Visbreaker Intermediate Stop Unit Line Manufacturing Column Dram Heat Exchanger Air Cooler Reactor Valve Maintenance and Repair Works
- Refinery-wide Steam Traps Manufacturing-Assembly-Assembly Works
- Refinery-wide Isg Metal Fabrication-Assembly-Assembly Works
- U 7000 Hampetrol Intermediate Stop Unit Metal Fabrication Works
- Unit Metal Fabrication Works at U Fcc Unit Planned Shutdown
- Plant 900 Unit Concrete Chimney Railing and Stair Manufacturing-Assembly Works
- Tüpraş Kırıkkale Refinery 2008-2023 Turkey
- Plant 1350 Hcp Units Planned Stop Column Dram Heat Exchanger and Air Cooler Equipment Maintenance Tests Safety Valves and Orifice Dismantling Assembly Works.
- Plant 1850 Hydrogen Units Planned Shutdown Column Dram Heat Exchanger and Air Cooler Equipment Maintenance Tests Safety Valves and Orifice Dismantling Assembly Works.
- Plant 1825 Sulfur Units Planned Shutdown Column Dram Heat Exchanger and Air Cooler Equipment Maintenance Tests Safety Valves and Orifice Dismantling Assembly Works.
- Plant 5400 Water Stripping Units Planned Shutdown Column Dram Heat Exchanger and Air Cooler Equipment Maintenance Tests Safety Valves and Orifice Dismantling Assembly Works.
- Plant Hp/Hcp Units Planned Shutdown Heat Exchangers Maintenance Work.
- Russian boiler asbestos removal
Tüpraş Batman Refinery 2017-2019 Turkey
- Hampetrol Unit Planned Shutdown Heat Exchanger Column Dram and Coolers Maintenance and Repair Works
Tüpraş İzmit Refinery B Area Rub Project 2018 Turkey
- Turkey – commissioning of zone B
- Plt 126 Heat Exchanger Maintenance
Petkim Aliaga 2016-2019 Turkey
- Factory-wide retubing and testing of heat exchangers and air coolers
Bortes Pipe Installation 2009 Turkey
- Izmit Refinery Tank 315-316-317 5000 tons Tank Manufacturing and Installation
Izdemir Energy 2017 Turkey
- Turbo Generator Retub Works
- Turbo Generator Retub Works
- Coke Plant Piping Works
Ansaldo Aen Power Plant 2018 Turkey
- Power Plant Planned Shutdown, Heat Exchanger Retubing Work
- Power Plant Planned Stance, Dram Base Sheet Replacement Work
- Çelikler Seyitömer Power Plant 2017-2022 Turkey
- 4th Unit 1st and 2nd Boiler Body Sheet Renewal and Maintenance-Repair Works
- Isolation Manufacturing Dismantling Assembly Works
- 4th Unit 1st and 2nd Boiler Boiler Boiler Grates Renovation and Maintenance-Repair
- Unit 4 1st and 2nd Boiler Pipelines Renovation Maintenance and Repair
- Unit 2 Coal Bunkers Grate And Platform Manufacturing And Erection
Aksa Antalya Power Plant 2020-2022 Turkey
- Shut/Down Time Equipment Maintenance, Repair, Scaffolding and Insulation Works
Unit Operations at Intermediate Stop
Aksa Van Power Plant 2021-2022 Turkey
- Equipment Maintenance and Insulation Assembly and Disassembly Works
Aksa Aliaga Power Plant 2021 Turkey
- Equipment Maintenance and Insulation Assembly and Disassembly Works
Heydar Aliyev Refinery 2022 Azerbaijan
- Heat Exchanger and Air Cooler Maintenance and Repair Works
Column Maintenance Works
Aksa Manisa Power Plant 2021 Turkey
- Equipment Maintenance and Insulation Assembly and Disassembly Works
Posco Assan Alimünyum 2015 Turkey
- Factory-wide Metal Maintenance-Repair-Manufacturing-Construction Works